Systems integration
One coordinated production line
Vietnam automation engineering firms and machine builders design and integrate cells and lines, mainly using imported robot hardware. Define the complete outcome and responsibility for every interface.
- 01
Engineering and layout
Translate the process into a layout, cycle-time model and equipment specification. Confirm utilities and upstream and downstream connections.
- 02
Tooling, controls and safety
Fixtures, end effectors, conveyors, PLCs and safeguarding belong in the same scope. Confirm destination compliance before construction.
- 03
Factory acceptance testing
Agree measurable acceptance criteria before ordering. Use representative parts, production conditions and documented results.
- 04
Installation and site acceptance
Plan freight, access, rigging, utilities and commissioning. Identify the receiving team and final acceptance conditions.
- 05
Training and ongoing support
Include operator and maintenance training, documents, spare parts and fault escalation. Establish software ownership and access rights.
Make proposals comparable
- Use the same specification for each supplier
- Separate equipment, freight and installation costs
- Document exclusions and buyer responsibilities
- Agree milestones and acceptance evidence
Define your complete line
Tell us what you need to automate and where it needs to go.